Industrial Hygiene - Safety
Industrial Hygiene
Change of Operations Notifcation
This form is used to notify the Industrial Hygienist of any changes to operations conducted by your department. The notification form may be copied as needed.
Indoor Air Quality
Individuals working in buildings with indications of poor IAQ shall report the problem(s) to their immediate supervisors. If the Navy maintains the building, the appropriate supervisor shall coordinate all contact with the designated facilities maintenance activity and the region or activity safety manager. If the region or activity is unable to determine the cause of the problem, the safety manager shall request the cognizant industrial hygiene service to initiate an IAQ investigation.
Industrial Hygiene Survey Reports
Below is a listing of medical surveillance requirements for certain departments and the departmental surveys accomplished by the Industrial Hygienist from Naval Hospital Lemoore.
NOTE -These documents are FOUO and access to them is limited to NPS and NSAM Personnel.
Naval Postgraduate School
Naval Postgraduate School
- MAE - Golf Course Annex - Supplemental Survey (INTERIM REPORT)
- ECE - 2 Year Survey
- Physics - Gas Gun - Noise Survey (INTERIM REPORT)
- Space Systems - 2 Year Survey
- MAE/SP - Machine Shop - Noise Survey
- MAE - Turbo Propulsion Lab - Supplemental Survey
- MAE - Watkin Spaces - 2 Year Survey
- MAE - Halligan Spaces -2 Year Survey
- RoboDojo - 2 Year Survey
- MAE Watkins Vent Survey
- System's Engineering - Hand Tools - Noise Survey
- Halligan 101C Wave Machine - Noise Survey
- NPS HAZMAT Manager - 2 year Survey
- NPS ITACS - 2 year Survey
Other Commands
- NSAM - MWR - Golf Course Maintenance - Noise Survey (Advanced Memo)
<
Naval Postgraduate School
- Space Systems - Shaker Table - Noise Survey
- Information Sciences - 2 year Survey (INTERIM REPORT)
- CIRPAS - 2 Year Survey
- MAE Golf Course Annex - 2 year Survey
- MAE Halligan Hall Wind Tunnel Noise Survey (INTERIM REPORT)
- MAE Watkins Lab Vent Survey
- MAE Rocket Lab Noise Survey (INTERIM REPORT)
- MAE Rocket Lab Vent Survey (INTERIM REPORT)
- Meterorology - 2 year Survey
- Dudly Knox Library - 2 year Survey (INTERIM REPORT)
- Oceanography - 2 year Survey (INTERIM REPORT)
- Physics - 2 year Survey (INTERIM REPORT)
- RoboDojo - 2 year Survey (INTERIM REPORT)
- System Engineering - 2 year Survey (INTERIM REPORT)
- Security Management - 2 year Survey
- Space Systems Vaccum Champer Noise Survey (INTERIM REPORT)
- Physics nanoMEMS Vent Survey (INTERIM REPORT)
Other Commands
Naval Postgraduate School
- RoboDojo - Supplemental Survey
- Physics - Machine Shop Welding - Change of Operation Assessment
- Physics - nanoMEMS Lab - Vent Survey
- Physics - Bldg 230 - Gas Gun Noise Survey
- ECE Dept - 2 Year Survey
- Space Systems Dept - 2 Year Survey
- MAE - Bldg 217 - Ventilation Survey
- MAE - Halligan Hall Spaces - 2 Year Survey
- MAE - Watkins Spaces - 2 Year Survey
- ITACS - 2 Year Survey
- HMC&M Manager - 2 Year Survey
Other Commands
Naval Postgraduate School
- System Engineering - Bldg 233 - Indoor Air Quality Survey
- MAE - Watkins Hall - Lab Hoods Vent Survey
- Information Sciences Department - Two-Year Survey
- CIRPAS - Two-Year Survey
- Meteorology Department - Two-Year Survey
- Systems Engineering - Two-Year Survey
- Security Management - Two-Year Survey
- MAE/SP Joint Machine Shop - Two-Year Survey
- MAE Golf Course Annex Labs - Two-Year Survey
- Physics - Two-Year Survey
- Dudley Knox Library - Two-Year Survey
- Oceanography Department - Two-Year Survey
- Liquid Nitrogen Tanks Filling - Noise Measurements
Other Commands
Naval Postgraduate School
- Office Spaces - Liquid Nitrogen Tanks Filling - Noise Measurements
- Space Systems - Liquid Nitrogen Tanks Filling - Noise Measurements
- Space Systems - Liquid Nitrogen Tanks Dispensing - Noise Measurements
- Space Systems Academic Group - Two-Year Survey
- Space Systems - Machine Shop - Floor Coating Application Monitoring Results
- MAE - Watkins Lab Spaces - Two-Year Survey
- MAE - Lab Spaces - Two-Year Survey
- MAE - Change in Hearing Protection Requirements for Golf Course Annex Labs
- MAE - Building 217 - Lab Vent Hood Survey
- Physics - nanoMEMS Laboratory (Bldg 245) - Ventilation Measurements - September
- Physics - nanoMEMS Laboratory (Bldg 245) - Ventilation Measurements - May
- ITACS - Two-Year Survey
- Hazardous Materials Control and Management Coordinator - Two-Year Survey
- ECE Department - Two-Year Survey
- MOVES Labs - Two-Year Survey
- Beach Lab (Bldg 514) Exterior Paint Cleanup Exposure Evaluation
Other Commands
Naval Postgraduate School
- Meterology Department - Two-Year Survey
- CIRPAS - Two-Year Survey
- Security Managment Department - Two-Year Survey
- Physics Department - Two-Year Survey
- Physics Department - Split Hpokinson Pressure Bar Apparatus - Impact Noise Measurements
- Systems Engineering Department - Two-Year Survey
- Oceanography Department - Two-Year Survey
- Graduate School of Engineering and Applied Sciences Receiving Office - Baseline Survey
- Library Paper Shredder - Noise Dosimetry
- Dudley Knox Library - Two-Year Survey
- Information Sciences Department - Baseline Survey
- MAE Wa-204 Ultrasonic Horn Operation - Noise Measurements
- MAE Golf Course Annex Labs - Two-Year Survey
- MAE/SP Shared Machine Shop - Two-Year Survey
- MAE Bldg 245 Laboratory Hoods - Ventilation Measurements
- MAE Turbo Labs - Carbon Material Work - Change of Operation Assessment
Other Commands
- NSAM - Quality of Live Services Department - Two-Year Survey
- NSAM - MWR Golf Course Maintenance - New Debris Loader - Noise Survey Results
- NSAM - Navy Gateway Inn Laundry Room - Heat Stress Assessment
- MWR - Golf Course Department - Debris Loader - Noise Survey
- FLTLOGCTR - Fleet Logistic Center Monterey Detachment - Baseline Survey
Naval Postgraduate School
- MOVES Labs - Baseline Out Brief
- MAE Halligan Spaces - Two-Year Survey
- MAE Watkins Spaces - Two-Year Survey
- MAE Spanagal Machine Shop - Two-Year Survey
- MAE - Golf Course Annex Labs - Annual Survey
- MAE - Cold Spray Lab Glovebox Use - Exposure Evaluation
- ITACS - Two-Year Survey
- Meteorology - Two-Year Survey
- Meteorology - Misc Admin and Lab Spaces - Two-Year Survey
- Academic Media Systems - Two-Year Survey
- Building 259 - Baseline Survey
- Cottages - Baseline Survey
- Information Sciences Department - Baseline Survey
- Watkins Hall - Baseline Survey
- Oceanography - Admin and Misc Lab Spaces - Baseline Survey
- Physics Department - Annual Survey
- Misc Presentation Buildings - Baseline Survey
- Space Systems Department - Annual Survey
- System Engineering Department - Rm 201M Machine Tools - Light Survey
- System Engineering Department - Annual Survey
- ECE - Annual Survey Outbrief
- Glasgow Hall Spaces - Baseline Survey
- Ingersol Hall Spaces - Baseline Survey
- Misc Root Hall Spaces - Four-Year Survey
- Supply Department - Baseline Survey Outbrief
- Misc Spanagel Hall Spaces - Baseline Survey
- Library - Baseline Survey
- ECE Department - Annual Survey
- Misc Herrmann Hall Areas - Baseline Survey
Other Commands
Naval Postgraduate School
- CIRPAS - Two-Year Survey
- Library - Two-Year Survey
- Electrical and Computer Engineering Department - Annual Survey
- Space Systems - Annual Survey
- Space Systems - Ha 100 and 101C - Noise Survey
- Space Systems - Halligan Hall - Noise Survey
- Staff Judge Advocate Office - Light Survey
- MAE - Functional Materials Lab - Wa237 - Recommended Controls
- MAE - Gold Course Annex Labs - Annual Survey
- MAE - Halligan Hall Spaces - Annual Survey
- MAE - Watkins Hall Spaces - Annual Survey
- MAE - Bldg 245 Rm 138C - Gas Turbine Engine Test Cell - Noise Survey
- MAE and Space System - Combined Machine Shop - Annual Survey
- Security Management Department - Two-Year Survey
- Oceanography Department - Annual Survey
- Physics Department - Monolithic Railgun Firing - Air Sampling Report
- Physics - Scanning Electron Microscope Lab - Sp 024- Mercury Survey
- Physics Department - Annual Survey
- Systems Engineering Department - Annual Survey
Other Commands
- NPS - Electrical and Computer Engineering Department - Annual Survey
- NPS - MAE Golf Course Annex Labs - Annual Survey
- NPS - MAE Halligan Hall Spaces - Annual Survey
- NPS - MAE - Machine Shop Acrylic Bonding - Monitoring Data
- NPS - MAE and Space Systems - Combined Machine Shop - Annual Survey
- NPS - MAE Watkins Hall Spaces - Annual Survey
- NPS - MAE - Diesel Engine Test Cell - Noise Survey
- NPS - Meteorology Department - Two-Year Survey
- NPS - Physics - Rail Gun Firing - Monitoring Results
- NPS - Oceanography Department - Annual Survey
- NPS - Physics Department - Annual Survey
- NPS - Root Hall - Noise Measurements
- NPS - Systems Engineering Department - Baseline Survey
- NSAM - Police/ Security Force Department - Two-Year Survey
- NEX - Navy Exchange Department - Annual Survey
- MWR - Naval Support Detachment Monterey - Annual Survey
- MWR - Naval Support Detachment Monterey - Dishwashing Noise Dosimetry
- MWR - Dishwashing Personnel - Noise Dosimetry Results
- CIRPAS - Baseline Survey
- FNMOC - Fleet Numerical Meteorology and Oceanography Center - Periodic Survey
Naval Postgraduate School
- Electrical and Computer Engineering Department - Annual Survey
- Library - Two-Year Survey
- MAE - Golf Course Annex Labs - Annual Survey
- MAE - Halligan Hall Spaces - Annual Survey
- MAE - Watkins Hall Spaces - Annual Survey
- MAE and Space Systems - Combined Machine Shop - Annual Survey
- Oceanography Department - Annual Survey
- Physics Department - Annual Survey
- Security Management - Two-Year Survey
- Space Systems Department Labs - Annual Survey
- Space Systems - Ha022 - Noise Measurements
- Space Systems - Ha101C - Noise Measurements
- Space Systems - Bu025 - Noise Measurements
- Space Systems - 3D Printer - Noise Survey
- Space Systems - Shaker Table - Noise Survey
Other Commands
- NPS - Audiovisual Department - Two-Year Survey
- NPS - Electrical and Computer Engineering Department - Annual Survey
- NPS - Mechanical and Astronautical Engineering Department - Annual Survey
- NPS - MAE and Space Systems Combined Machine Shop - Baseline Survey
- NPS - Meteorology Department - Annual Survey
- Center for Information Dominance Detachment Monterey - Annual Survey
- NPS - Physics Department - Annual Survey
- NPS - Physics Department - Wood Shop - Noise Survey
- NPS - Physics Department - Spanagel Rm 000 - Ventilation Survey
- NPS - Physics Department - Rail Gun Lab - Noise Survey
- NSDM - Environmental Office - Annual Survey
- NSAM - MWR - Annual Survey
- FNMOC Monterey - Periodic Survey
- FNMOC - Fleet Numerical Meteorology and Oceanography Center, Monterey - Periodic Survey
- NPS - Space Systems - Annual Survey
- NPS - Electrical and Computer Engineering Department - Annual Survey
- NPS - Library - Two-Year Survey
- NMAU Monterey 2006 Periodic Survey
- NPS - Information Resources Directorate - Periodic Survey
- NPS - Information Resources Directorate - Annual Survey
- NSAM - MWR - Annual Survey
- OCL Directorate 2004 Periodic Survey
- Protocol Dept 2004 Periodic Survey
- Public Affairs Office Dept 2004 Periodic Survey
- Staff JAG Office 2004 Periodic Survey
- Mathematics Dept 2004 Periodic Survey
- Mezzanine Offices 2004 Periodic Survey
- National Security Affairs Dept 2004 Periodic Survey
- Command Evaluation 2004 Periodic Survey
- Comptroller Dept 2004 Periodic Survey
- Flag Administration Dept 2004 Periodic Survey
- HRO and EEO 2004 Periodic Survey
- 2004 - NSAM - MWR - Annual Survey
- 2004 - Physics Dept Annual Survey
- 2004 - NSAM - Security Management - Annual Survey
- 2004 - MWR - Flying Club - Paint Primer Application - Air Sample
- 2004 - NEX Monterey - Annual Survey
- 2004 - NPS - Library - Two-Year Survey
- 2004 - NPS - Library - Document Shredder - Noise Survey
- 2004 - NPS - Space Systems Dept Annual Survey
- 2004 - NPS - Space Systems Machine Shops Supplemental Annual Survey
- 2004 - NPS - ECE Dept Annual Survey
- 2004 - NPS - Oceanography Department - Annual Survey
- 2004 - NPS - Meteorology Dept - Annual Survey
- 2004 - NPS - Mechanical and Astronautical Engineering Dept - Annual Survey
- 2004 - Naval Research Laboratory - Four Year Survey
- 2003 - Meteorology Dept Annual Survey
- 2003 - Meteorology Dept - Bldg 232 Roof Fans - Noise Survey
- 2003 - Physics Dept Annual Survey
- 2003 - Physics Dept - Machine Shops Supplimental Annual Survey
- 2003 - Physics Dept - Spanagel Rm 000 and 131 - Ventilation Survey
- 2003 - NSAM - MWR - Annual Survey
- 2003 - ECE Dept Annual Survey
- Code 01, 2003 Baseline Survey
- 2003 - NEX Monterey Annual Survey
- 2003 - MWR - Gym & Ball Field Maintainence Equipment - Noise Survey
- 2003 - Space Systems Dept Annual Survey
- 2003 - NPS - Security Management - Periodic Survey
- 2002 - Meteorology Dept Annual Survey
- 2002 - ECE Dept Annual Survey
- 2002 - Mechanical Engineering Dept Annual Survey
- 2002 - Physics Dept Annual Survey
- 2002 - NPS Library - Two-Year Survey
- 2002 - Oceanography - Beach Labs - Paint Application - Monitoring Data
- 2002 - NSAM - MWR - Annual Survey
- 2002 - MWR - Laundry Room - Noise Survey
- 2002 - NEX Monterey Annual Survey
- Code 06 GSOIS, 2002 Periodic Survey
- International Graduate Studies 2002 Baseline Survey
- 2002 - FNMOC Monterey - Periodic Survey
- 2001 - NEX Monterey Annual Survey
- 2001 - NEX Monterey - Auto Center - Tire Patching - Monitoring Data
- 2001 - NEX Monterey - Auto Center - Brake Change - April - Monitoring Data
- 2001 - NEX Monterey - Auto Center - Brake Change - December - Monitoring Data
- 2001 - Physics Dept - Annual Survey
- 2001 - Space Systems Dept- Annual Survey
- 2001 - Aeronautics and Astronautics Dept - Annual Survey
- 2001 - Meteorology Dept - Annual Survey
- 2001 - Mechanical Engineering Dept - Annual Survey
- 2001 - NSAM - MWR - Annual Survey
- 2001 - MWR - Hull Sanding - July Noise Survey
- 2001 - MWR - Hull Sanding - April Noise Survey
- 2001 - MWR - Hull Sanding - November Noise Survey
- 2001 - Physics Dept - Spanagel Rm 000 and 131 - Ventilation Survey
- 2001 - Physics Dept - Lab Chemical Use - Monitoring Data
- 2001 - ECE Dept Annual Survey
- 2001 - ECE Dept - Liquid Electrical Tape Use and Aerosol Can Painting - Monitoring Data
- 2001 - Oceanography - Annual Survey
- 2001 - Oceanography - Golf Course Annex - Lead Disc Sanding - Monitoring Data
- Naval Research Laboratory - Annual Survey
- Research Office 2000 Baseline Survey
- Systems Management Dept 2000 Periodic Survey
- 2000 - NEX Monterey Annual Survey
- 2000 - Space Systems Dept Annual Survey
- 2000 - Oceanography Dept - Annual Survey
- 2000 - Mechanical Engineering Dept - Annual Survey
- 2000 - NEX Monterey - Auto Center - Monitoring Data
- 2000 - Meteorology Dept Annual Survey
- 2000 - FNMOC Monterey - Periodic Survey
- 2000 - NPS - Security Management - Baseline Survey
- 2000 - NPS Library - Two-Year Survey
- 2000 - ECE Dept Annual Survey
- 2000 - Physics Dept Annual Survey
- National Security Affairs Dept 2000 Annual Survey
- 2000 - MWR - Annual Survey
- 2000 - MWR - Hull Sanding - Noise Survey
- 2000 - Physics Dept - Spanagel Rm 000 and 131 - Ventilation Survey
- 1999 - NEX Monterey Annual Survey
- 1999 - NEX Monterey - Auto Center - Brake Change - Monitoring Data
- 1999 - Meteorology Dept Annual Survey
- 1999 - Physics Dept Annual Survey
- 1999 - Oceanography Dept Annual Survey
- 1999 - Space Systems Dept Annual Survey
- 1999 - NSA Monterey Bay - Security Management - Baseline Survey
- 1999 - ECE Dept - Annual Survey
- 1999 - Areonautics and Astronautics Dept - Annual Survey
- 1999 - Mechanical Engineering Dept - Annual Survey